Tagged: Cabin Fit-Out

1

3873Hrs – Doing All I Can

That’s the theme right now as time ticks away and the pressure starts to ramp up. I had trouble sleeping last night as my brain fizzed with thoughts of moving out of our rental cottage, lists...

0

3866Hrs – Cabin Fit-Out Day 6

I pushed hard today and got the last pieces of structural furniture in place. I’ve added two more decent sized shelves alongside the double berth and fitted fronts to the highest ones. I’ve also fitted the...

1

3857Hrs – Cabin Fever

A different day but the same old work. I should have known this would be a slog, it was the same in the galley. I’ve made things harder by building in far more storage than I’d...

3849Hrs – It’s Slow But It’s Progress 0

3849Hrs – It’s Slow But It’s Progress

I slept well, too well, I really didn’t feel like heading out the door this morning but I have to keep moving, not least because it’s now less than four weeks until the wagon arrives to...

0

3837Hrs – Cabin Taking Shape

A good days work today, the brain and hands worked together well and I’ve made good progress with the cabin fit-out. I’ve pretty much nailed down the main pieces of construction. I’ve still got plenty left...