1783Hrs- Half Time
I’ve now got the aft and forward sections of the cabin sides on the port hull cut and glued in two 2.5 hour work sessions. By my reckoning that’s less than half the time it took me to do the ones on the starboard hull. With luck I should get the port hull enclosed by the end of next week and that’ll be summer objective achieved. I will soon have to sit down and map out what I’m doing next. I’m adamant I’m going to keep moving through the winter so there will be two job lists. One for cold weather, one for mild weather, that way I’ll always have something to do.